Difference between revisions of "Rio Bravo Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 6: Line 6:
 
* Website:  https://whitewatermidstream.com/
 
* Website:  https://whitewatermidstream.com/
 
* Length:  kilometres (137 miles)  
 
* Length:  kilometres (137 miles)  
* Capacity: per day  
+
* Capacity: 4.5 billion cubic feet per day
 
* Status: Planned
 
* Status: Planned
  

Revision as of 11:44, 13 May 2024

Summary Information

  • Source: Agua Dulce
  • Destination: Brownsville, Texas
  • Ownership: Whitewater
  • Website: https://whitewatermidstream.com/
  • Length: kilometres (137 miles)
  • Capacity: 4.5 billion cubic feet per day
  • Status: Planned

Details

  • The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande Export Terminal LNG Project in Brownsville, Texas
  • Construction is expected to begin in 2025 and be completed in 2026

History

  • 2024 - Whitewater became a partner in the pipeline

Other Information

  • -

Links

  1. Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand