Difference between revisions of "Rio Bravo Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Source: | + | * Source: Agua Dulce |
− | * Destination: | + | * Destination: Brownsville, Texas |
− | * Ownership: | + | * Ownership: Whitewater |
− | * Website: | + | * Website: https://whitewatermidstream.com/ |
− | * Length: kilometres ( miles) | + | * Length: kilometres (137 miles) |
− | * Capacity: per day | + | * Capacity: 4.5 billion cubic feet per day |
− | * Status: | + | * Status: Planned |
=== Details === | === Details === | ||
* The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's [[Rio Grande Export Terminal LNG Project]] in Brownsville, Texas | * The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's [[Rio Grande Export Terminal LNG Project]] in Brownsville, Texas | ||
+ | * Construction is expected to begin in 2025 and be completed in 2026 | ||
=== History === | === History === | ||
− | * 2024 - | + | * 2019 - Enbridge and Next Decade formed a joint venture for the pipeline |
+ | * 2024 - Whitewater became a partner in the pipeline | ||
=== Other Information === | === Other Information === | ||
Line 19: | Line 21: | ||
=== Links === | === Links === | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/nextdecade-and-enbridge-announce.html NextDecade and Enbridge Announce Strategic MOU for the Development of Rio Bravo Pipeline for the Rio Grande LNG Project] | ||
# [https://abarrelfull.blogspot.com/2024/05/enbridge-to-enter-into-jv-connecting.html Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand] | # [https://abarrelfull.blogspot.com/2024/05/enbridge-to-enter-into-jv-connecting.html Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
− | [[category: | + | [[category:USA]] |
− | [[category: | + | [[category:WhiteWater]] |
Latest revision as of 11:51, 13 May 2024
Summary Information
- Source: Agua Dulce
- Destination: Brownsville, Texas
- Ownership: Whitewater
- Website: https://whitewatermidstream.com/
- Length: kilometres (137 miles)
- Capacity: 4.5 billion cubic feet per day
- Status: Planned
Details
- The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande Export Terminal LNG Project in Brownsville, Texas
- Construction is expected to begin in 2025 and be completed in 2026
History
- 2019 - Enbridge and Next Decade formed a joint venture for the pipeline
- 2024 - Whitewater became a partner in the pipeline
Other Information
- -