Grand Prix NGL Pipeline

From A Barrel Full
Revision as of 14:37, 10 May 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Source: Permian Basin
  • Destination: Mont Belvieu
  • Ownership: Targa Resources
  • Website: https://www.targaresources.com/
  • Length: kilometres ( miles)
  • Capacity: 600,000 barrels of oil per day
  • Crude Type: NGLs

Brief Description

  • The Grand Prix Pipeline connects gathering and processing positions throughout the Permian Basin, North Texas, and Southern Oklahoma (as well as third-party positions) to fractionation and storage in the NGL market hub at Mont Belvieu, Texas.
  • Grand Prix transports NGLs from the Permian Basin on a 24-inch diameter pipeline with capacity of 600 MBbl/d, and from North Texas and South and Central Oklahoma via a pipeline of varying capacity, which both connect to a 30-inch diameter segment into Mont Belvieu, which is expandable to 1,000 MBbl/d.

Pipeline Status

  • In operation

History

  • 2019 - Grand Prix Pipeline was completed
  • 2020 - Open season launched for extension to Kingfisher County

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2015-2020
  2. Targa NGL Pipeline Company Launches Open Season