European Gas Pipeline Link (EUGAL)
Revision as of 09:55, 10 May 2024 by Abarrelfull (talk | contribs)
Summary Information
- Source: Mecklenburg
- Destination: Deutschneudorf
- Ownership: Gascade
- Website: https://www.gascade.de/
- Length: 480 kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- From the Baltic Sea through Mecklenburg-Western Pomerania and as far as Brandenburg, EUGAL runs in two strings; through Saxony and over the border to the Czech Republic, it runs in just one string.
- The pipeline was built to add capacity for gas coming from the Nord Stream Gas II Pipeline
- EUGAL interconnects with the JAGAL Gas Pipeline and the North European Natural Gas Pipeline (NEL)
History
- 2020 - The pipeline began operating
- 2021 - The pipeline reached full capacity
Other Information
- -