Difference between revisions of "European Gas Pipeline Link (EUGAL)"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: Mecklenburg * Destination: Czech Republic * Ownership: Gascade * Website: https://www.gascade.de/ * Length: 480 kilometres ( miles) *...")
 
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
* Source: Mecklenburg
 
* Source: Mecklenburg
* Destination: Czech Republic
+
* Destination: Deutschneudorf
 
* Ownership: Gascade
 
* Ownership: Gascade
 
* Website: https://www.gascade.de/  
 
* Website: https://www.gascade.de/  
Line 11: Line 11:
 
=== Details ===
 
=== Details ===
 
* From the Baltic Sea through Mecklenburg-Western Pomerania and as far as Brandenburg, EUGAL runs in two strings; through Saxony and over the border to the Czech Republic, it runs in just one string.
 
* From the Baltic Sea through Mecklenburg-Western Pomerania and as far as Brandenburg, EUGAL runs in two strings; through Saxony and over the border to the Czech Republic, it runs in just one string.
 +
* The pipeline was built to add capacity for gas coming from the [[Nord Stream Gas II Pipeline]]
 +
* EUGAL interconnects with the [[JAGAL Gas Pipeline]] and the [[North European Natural Gas Pipeline (NEL)]]
  
 
=== History ===
 
=== History ===
Line 21: Line 23:
 
=== Links ===
 
=== Links ===
 
# [https://www.gascade.de/en/our-network/our-pipelines/eugal Gascade, EUGAL]
 
# [https://www.gascade.de/en/our-network/our-pipelines/eugal Gascade, EUGAL]
 +
# [https://abarrelfull.blogspot.com/2024/05/eugal-full-capacities-available.html EUGAL: Full Capacities Available]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:Germany]]
 
[[category:Germany]]
 
[[category:Gascade]]
 
[[category:Gascade]]

Latest revision as of 14:35, 10 May 2024

Summary Information

  • Source: Mecklenburg
  • Destination: Deutschneudorf
  • Ownership: Gascade
  • Website: https://www.gascade.de/
  • Length: 480 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

Details

History

  • 2020 - The pipeline began operating
  • 2021 - The pipeline reached full capacity

Other Information

  • -

Links

  1. Gascade, EUGAL
  2. EUGAL: Full Capacities Available