Difference between revisions of "JAGAL Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Source: Frankfurt am Oder, Germany | * Source: Frankfurt am Oder, Germany | ||
Line 9: | Line 9: | ||
* Status: Operating | * Status: Operating | ||
− | + | === Details === | |
* The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with [[STEGAL Gas Pipeline]] | * The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with [[STEGAL Gas Pipeline]] | ||
* It links the [[Yamal-Europe pipeline]] to the German transmission system | * It links the [[Yamal-Europe pipeline]] to the German transmission system | ||
− | + | === History === | |
* 1995 - Construction of the pipeline began | * 1995 - Construction of the pipeline began | ||
* 1999 - The first gas flows through the pipeline | * 1999 - The first gas flows through the pipeline | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [http://www.wingas.com/chronik_1999.html?&L=1 Wingas History, 1999] | # [http://www.wingas.com/chronik_1999.html?&L=1 Wingas History, 1999] | ||
# [https://www.gascade.de/en/our-network/our-pipelines/jagal Gascade, JAGAL] | # [https://www.gascade.de/en/our-network/our-pipelines/jagal Gascade, JAGAL] | ||
+ | |||
+ | [[category:Pipeline]] | ||
+ | [[category:Germany]] | ||
+ | [[category:Gascade]] |
Latest revision as of 09:50, 10 May 2024
Summary Information
- Source: Frankfurt am Oder, Germany
- Destination: Rückersdorf, Germany
- Ownership: Gascade
- Website: https://www.gascade.de/
- Length: 338 kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with STEGAL Gas Pipeline
- It links the Yamal-Europe pipeline to the German transmission system
History
- 1995 - Construction of the pipeline began
- 1999 - The first gas flows through the pipeline
Other Information
- -