Difference between revisions of "JAGAL Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 11: Line 11:
 
+++ Details
 
+++ Details
 
* The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with [[STEGAL Gas Pipeline]]
 
* The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with [[STEGAL Gas Pipeline]]
* It links the [[Yamal-Europe Pipeline]] to the German transmission system
+
* It links the [[Yamal-Europe pipeline]] to the German transmission system
  
 
+++ History
 
+++ History

Revision as of 20:55, 9 May 2024

Summary Information

  • Source: Frankfurt am Oder, Germany
  • Destination: Rückersdorf, Germany
  • Ownership: Gascade
  • Website: https://www.gascade.de/
  • Length: 338 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

+++ Details

  • The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with STEGAL Gas Pipeline
  • It links the Yamal-Europe pipeline to the German transmission system

+++ History

  • 1995 - Construction of the pipeline began
  • 1999 - The first gas flows through the pipeline

+++ Other Information

  • -

+++ Links

  1. Wingas History, 1999
  2. Gascade, JAGAL