Difference between revisions of "JAGAL Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Source: Frankfurt am Oder, Germany
 
* Source: Frankfurt am Oder, Germany
Line 9: Line 9:
 
* Status: Operating
 
* Status: Operating
  
+++ Details
+
=== Details ===
 
* The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with [[STEGAL Gas Pipeline]]
 
* The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with [[STEGAL Gas Pipeline]]
* It links the [[Yamal Europe Pipeline]] to the German transmission system
+
* It links the [[Yamal-Europe pipeline]] to the German transmission system
  
+++ History
+
=== History ===
 
* 1995 - Construction of the pipeline began
 
* 1995 - Construction of the pipeline began
 
* 1999 - The first gas flows through the pipeline
 
* 1999 - The first gas flows through the pipeline
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ Links
+
=== Links ===
 
# [http://www.wingas.com/chronik_1999.html?&L=1 Wingas History, 1999]
 
# [http://www.wingas.com/chronik_1999.html?&L=1 Wingas History, 1999]
 
# [https://www.gascade.de/en/our-network/our-pipelines/jagal Gascade, JAGAL]
 
# [https://www.gascade.de/en/our-network/our-pipelines/jagal Gascade, JAGAL]
 +
 +
[[category:Pipeline]]
 +
[[category:Germany]]
 +
[[category:Gascade]]

Latest revision as of 09:50, 10 May 2024

Summary Information

  • Source: Frankfurt am Oder, Germany
  • Destination: Rückersdorf, Germany
  • Ownership: Gascade
  • Website: https://www.gascade.de/
  • Length: 338 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

Details

  • The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with STEGAL Gas Pipeline
  • It links the Yamal-Europe pipeline to the German transmission system

History

  • 1995 - Construction of the pipeline began
  • 1999 - The first gas flows through the pipeline

Other Information

  • -

Links

  1. Wingas History, 1999
  2. Gascade, JAGAL