Difference between revisions of "Centurion Crude Oil Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
* Ownership: Centurion Pipeline (Oxy)
 
* Ownership: Centurion Pipeline (Oxy)
 
* Website: http://www.centurionpipeline.com/
 
* Website: http://www.centurionpipeline.com/
* Length:  kilometres (2,750 miles)  
+
* Length:  kilometres (3,000 miles)  
 
* Capacity: 350,000  barrels of oil per day  
 
* Capacity: 350,000  barrels of oil per day  
 
* Crude Type:
 
* Crude Type:
Line 11: Line 11:
 
=== Brief Description ===
 
=== Brief Description ===
  
* An oil-gathering, common carrier pipeline and storage system with approximately 2,750 miles of pipelines from southeast New Mexico across the Permian Basin of southwest Texas to Cushing, Oklahoma.  
+
* A large-scale, integrated network of approximately 3,000 miles of crude oil gathering and transportation pipelines that extends from southeast New Mexico across the Permian Basin of West Texas to Cushing, Oklahoma.
 
* The system has a current throughput capacity of about 350,000 barrels per day (Bpd) and 5 million barrels of active storage capability. Also, sixty-four truck unloading facilities are located at various points along the system, which allow for additional volumes to be delivered into the pipeline.
 
* The system has a current throughput capacity of about 350,000 barrels per day (Bpd) and 5 million barrels of active storage capability. Also, sixty-four truck unloading facilities are located at various points along the system, which allow for additional volumes to be delivered into the pipeline.
 +
* The pipeline connects to the [[BridgeTex Oil Pipeline]] in Colorado City (Texas)
 
* The pipeline also serves the [[Big Spring Refinery]]
 
* The pipeline also serves the [[Big Spring Refinery]]
  
Line 22: Line 23:
 
* 2007 - Centurion acquired the West Texas Pipeline System from BP
 
* 2007 - Centurion acquired the West Texas Pipeline System from BP
 
* 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin
 
* 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin
 +
* 2014 - Cline Shale Pipeline project completed
 
* 2021 - Cushing South Pipeline project Phase I completed
 
* 2021 - Cushing South Pipeline project Phase I completed
 +
* 2023 - Energy Transfer acquired the pipeline
  
=== Other Information
+
=== Other Information ===
  
 
* -
 
* -
Line 33: Line 36:
 
# [http://www.centurionpipeline.com/documents/Centurion%20Fact%20Sheet.pdf Fact Sheet]  
 
# [http://www.centurionpipeline.com/documents/Centurion%20Fact%20Sheet.pdf Fact Sheet]  
 
# [http://killajoules.wikidot.com/archive:centurion-pipeline-l-p-to-develop-new-crude-oil-tran Centurion Pipeline L.P. to Develop New Crude Oil Transportation Capacity in Permian Basin]
 
# [http://killajoules.wikidot.com/archive:centurion-pipeline-l-p-to-develop-new-crude-oil-tran Centurion Pipeline L.P. to Develop New Crude Oil Transportation Capacity in Permian Basin]
 +
# [https://abarrelfull.blogspot.com/2024/05/energy-transfer-to-acquire-lotus.html Energy Transfer To Acquire Lotus Midstream In A $1.45 Billion Transaction]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:USA]]
 
[[category:USA]]
 
[[category:Energy Transfer]]
 
[[category:Energy Transfer]]

Latest revision as of 06:51, 16 May 2024

Summary Information

  • Source: southeast New Mexico
  • Destination: Cushing, Oklahoma
  • Ownership: Centurion Pipeline (Oxy)
  • Website: http://www.centurionpipeline.com/
  • Length: kilometres (3,000 miles)
  • Capacity: 350,000 barrels of oil per day
  • Crude Type:

Brief Description

  • A large-scale, integrated network of approximately 3,000 miles of crude oil gathering and transportation pipelines that extends from southeast New Mexico across the Permian Basin of West Texas to Cushing, Oklahoma.
  • The system has a current throughput capacity of about 350,000 barrels per day (Bpd) and 5 million barrels of active storage capability. Also, sixty-four truck unloading facilities are located at various points along the system, which allow for additional volumes to be delivered into the pipeline.
  • The pipeline connects to the BridgeTex Oil Pipeline in Colorado City (Texas)
  • The pipeline also serves the Big Spring Refinery

Pipeline Status

  • In operation

History

  • 2004 - Oxy acquired an oil-gathering and pipeline system in the Permian Basin from ExxonMobil
  • 2007 - Centurion acquired the West Texas Pipeline System from BP
  • 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin
  • 2014 - Cline Shale Pipeline project completed
  • 2021 - Cushing South Pipeline project Phase I completed
  • 2023 - Energy Transfer acquired the pipeline

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2021-2025
  2. Fact Sheet
  3. Centurion Pipeline L.P. to Develop New Crude Oil Transportation Capacity in Permian Basin
  4. Energy Transfer To Acquire Lotus Midstream In A $1.45 Billion Transaction