Difference between revisions of "Centurion Crude Oil Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
* Ownership: Centurion Pipeline (Oxy) | * Ownership: Centurion Pipeline (Oxy) | ||
* Website: http://www.centurionpipeline.com/ | * Website: http://www.centurionpipeline.com/ | ||
− | * Length: kilometres ( | + | * Length: kilometres (3,000 miles) |
* Capacity: 350,000 barrels of oil per day | * Capacity: 350,000 barrels of oil per day | ||
* Crude Type: | * Crude Type: | ||
Line 11: | Line 11: | ||
=== Brief Description === | === Brief Description === | ||
− | * | + | * A large-scale, integrated network of approximately 3,000 miles of crude oil gathering and transportation pipelines that extends from southeast New Mexico across the Permian Basin of West Texas to Cushing, Oklahoma. |
* The system has a current throughput capacity of about 350,000 barrels per day (Bpd) and 5 million barrels of active storage capability. Also, sixty-four truck unloading facilities are located at various points along the system, which allow for additional volumes to be delivered into the pipeline. | * The system has a current throughput capacity of about 350,000 barrels per day (Bpd) and 5 million barrels of active storage capability. Also, sixty-four truck unloading facilities are located at various points along the system, which allow for additional volumes to be delivered into the pipeline. | ||
+ | * The pipeline connects to the [[BridgeTex Oil Pipeline]] in Colorado City (Texas) | ||
* The pipeline also serves the [[Big Spring Refinery]] | * The pipeline also serves the [[Big Spring Refinery]] | ||
Line 22: | Line 23: | ||
* 2007 - Centurion acquired the West Texas Pipeline System from BP | * 2007 - Centurion acquired the West Texas Pipeline System from BP | ||
* 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin | * 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin | ||
+ | * 2014 - Cline Shale Pipeline project completed | ||
* 2021 - Cushing South Pipeline project Phase I completed | * 2021 - Cushing South Pipeline project Phase I completed | ||
+ | * 2023 - Energy Transfer acquired the pipeline | ||
− | === Other Information | + | === Other Information === |
* - | * - | ||
Line 33: | Line 36: | ||
# [http://www.centurionpipeline.com/documents/Centurion%20Fact%20Sheet.pdf Fact Sheet] | # [http://www.centurionpipeline.com/documents/Centurion%20Fact%20Sheet.pdf Fact Sheet] | ||
# [http://killajoules.wikidot.com/archive:centurion-pipeline-l-p-to-develop-new-crude-oil-tran Centurion Pipeline L.P. to Develop New Crude Oil Transportation Capacity in Permian Basin] | # [http://killajoules.wikidot.com/archive:centurion-pipeline-l-p-to-develop-new-crude-oil-tran Centurion Pipeline L.P. to Develop New Crude Oil Transportation Capacity in Permian Basin] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/energy-transfer-to-acquire-lotus.html Energy Transfer To Acquire Lotus Midstream In A $1.45 Billion Transaction] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:Energy Transfer]] | [[category:Energy Transfer]] |
Latest revision as of 06:51, 16 May 2024
Contents
Summary Information
- Source: southeast New Mexico
- Destination: Cushing, Oklahoma
- Ownership: Centurion Pipeline (Oxy)
- Website: http://www.centurionpipeline.com/
- Length: kilometres (3,000 miles)
- Capacity: 350,000 barrels of oil per day
- Crude Type:
Brief Description
- A large-scale, integrated network of approximately 3,000 miles of crude oil gathering and transportation pipelines that extends from southeast New Mexico across the Permian Basin of West Texas to Cushing, Oklahoma.
- The system has a current throughput capacity of about 350,000 barrels per day (Bpd) and 5 million barrels of active storage capability. Also, sixty-four truck unloading facilities are located at various points along the system, which allow for additional volumes to be delivered into the pipeline.
- The pipeline connects to the BridgeTex Oil Pipeline in Colorado City (Texas)
- The pipeline also serves the Big Spring Refinery
Pipeline Status
- In operation
History
- 2004 - Oxy acquired an oil-gathering and pipeline system in the Permian Basin from ExxonMobil
- 2007 - Centurion acquired the West Texas Pipeline System from BP
- 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin
- 2014 - Cline Shale Pipeline project completed
- 2021 - Cushing South Pipeline project Phase I completed
- 2023 - Energy Transfer acquired the pipeline
Other Information
- -