Hytech Oil And Gas Processing References

From A Barrel Full
Jump to navigation Jump to search

PIONEER / EFS Midstream LLC (Eagle Ford, USA) – Conceptual Engineering for revamp Area 71 Central Gathering Point. YPFB - Yacimientos Petroliferos Fiscales Bolivianos- (Yacuiba, Bolivia) – Complete eFEED, preliminary Detailed Engineering for the new Gran Chaco 1000 MMSCFD NGL cryogenic plant. YPFB - Yacimientos Petroliferos Fiscales Bolivianos- (Río Grande, Bolivia) – Survey of FEED and EPC for a 200 MMSCFD Gas Treatment Cryogenic plant. PANAMERICAN ENERGY (Salta, Argentina) - Plant revamping of Dew Point and Amine CO2 removal plant from 106 to 177 MMSCFD – Piquirenda-San Pedrito REPSOL YPF (Malargüe, Argentina) – Extended FEED for a new crude treating plant and and its water treating plant at Divisadero, Loma de la Mina, Cargamento (Mendoza). PETROBRAS (Tarija, Bolivia) – Performance Analysis and Extended FEED for the Revamp of Sábalo Gas Plant PHOENIX PARK PROCESSORS LTD (Point Fortin, Trinidad & Tobago) – Analysis and optimization of a Turboexpander plant for LPG recovery. PETROBRAS (Tarija, Bolivia) – Extended FEED and Flow Assurance Analysis of well surface facilities, pipeline and plant interconnection for the ITU-X2 gas pipeline system. REPSOL YPF (Loma La Lata, Argentina) - Revamp of oil and water pipelines and stabilization plants to operate at low pressure in Neuquén areas. COMPAÑíA MEGA S.A. (Neuquén, Argentina) - Tower cooling water circuit for inlet gas of a 350 MMSCFD NGL Recovery cryogenic plant. TOTAL (Tierra del Fuego, Argentina) – Extended Conceptual Engineering for Capacity Increase and Optimization of 800 MMSCFD Gas processing plants located at Rio Cullen and Cañadón Alfa On EPC Scope execution: PETROBRAS / TOTAL / BG (Bolivia) - ITAU Gas Processing plant 200 MMSCFD- (Partners: Exterran and Kaiser) GAS MEDANITO / C3PLUS (Catriel, Argentina) - New 35 MMSCFD Cryogenic LPG Recovery plant (Partner SIMA) PIONEER N.R. (Neuquén, Argentina) - New LPG Recovery, Fractionation and Storage plant (Loma Negra) (Partner: SIMA, intermediate client CBI); and further project comprising Capacity Increase from 75 to 110 MMSCFD (Partner: SIMA) PLUSPETROL (Centenario, Argentina) – Basic and Detailed Engineering Design for the a new Compression Station (Partner: SIMA) PETROBRAS (Sierra Chata – Neuquén, Argentina) - Low Compression System Revamp (Partner: SIMA) REPSOL-YPF (Loma La Lata, Neuquén, Argentina) – New 30,000 HP Low Pressure Compression facilities in four batteries (Partner: SIMA)