Gujarat Refinery Upgrade Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

The Project

  • Project Type: Upgrade
  • Project Summary: A residuum upgrade project designed to eliminate heavy fuel oils
  • Main Contractors:
    • Foster Wheeler: license and basic engineering package for the new delayed coker
    • Punj Lloyd: Residual basic and detailed engineering, procurement, construction and commissioning

Refining Units

  • Delayed Coker - 3.7 mta
  • Diesel Hydrotreater,
  • Sulphur Recovery Plant

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • Ultra low sulphur diesel

History

  • 2007 - Foster Wheeler Ltd. was awarded a contract to provide a license and basic engineering package for the new delayed coker.
  • 2011 - Project completed

Other Information

-

Links

  1. Uhde Downstream Oil And Gas Projects
  2. Gujarat Refinery Webpage
  3. Foster Wheeler Receives Delayed Coker Award from Indian Oil Corporation Limited
  4. Punj Lloyd Refining References