Difference between revisions of "Shetland Island Regional Gas Export Pipeline System (SIRGE)"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: Sullom Voe * Destination: Frigg UK Gas Pipeline System * Ownership: NSMP * Website: https://www.nsmp-limited.com/ * Length: 234 kilometr...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 11: | Line 11: | ||
=== Details === | === Details === | ||
* The pipeline connects the [[Shetland Gas Plant]] (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the [[Frigg UK Gas Pipeline System]] | * The pipeline connects the [[Shetland Gas Plant]] (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the [[Frigg UK Gas Pipeline System]] | ||
− | * It transports gas from | + | * It transports gas from [[Laggan and Tormore Gas Fields]] as well as [[Edradour Gas and Condensate Field]] |
=== History === | === History === | ||
+ | * 2015 - NSMP acquired the pipeline from Total | ||
* 2016 - Pipeline enter operations | * 2016 - Pipeline enter operations | ||
Line 21: | Line 22: | ||
=== Links === | === Links === | ||
# [https://www.nsmp-limited.com/our-assets/sirge-pipeline/ SIRGE Pipeline, NSMP] | # [https://www.nsmp-limited.com/our-assets/sirge-pipeline/ SIRGE Pipeline, NSMP] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/nsmp-acquires-major-pipeline-and.html NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:UK]] | [[category:UK]] | ||
[[category:NSMP]] | [[category:NSMP]] |
Latest revision as of 10:09, 8 May 2024
Summary Information
- Source: Sullom Voe
- Destination: Frigg UK Gas Pipeline System
- Ownership: NSMP
- Website: https://www.nsmp-limited.com/
- Length: 234 kilometres ( miles)
- Capacity: 665mmscf per day
- Status: Operating
Details
- The pipeline connects the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the Frigg UK Gas Pipeline System
- It transports gas from Laggan and Tormore Gas Fields as well as Edradour Gas and Condensate Field
History
- 2015 - NSMP acquired the pipeline from Total
- 2016 - Pipeline enter operations
Other Information
- -