Odessa-Brody-Plock Oil pipeline

From A Barrel Full
Revision as of 13:28, 8 May 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Azerbaijan * Destination: Poland * Ownership: Sarmatia * Website: http://sarmatia.com.pl/ * Length: kilometres ( miles) * Capacity: barrels...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

+++ The Route

  • The Corridor goes through the territory of Azerbaijan Republic, Georgia, the Black Sea, Ukraine and Poland

+++ Pipeline Status

  • Planned

+++ History

  • 2004 - The "Sarmatia” JV company was set up
  • 2009 - Granherne" prepared the project feasibility study

+++ Other Information

  • During the first stage up to 10 MTA of crude oil will be supplied to consumers in Ukraine, Slovakia and Czech Republic. It involves reversing of the Odessa-Brody oil pipeline.
  • During the second stage the construction of oil pipeline which will connect Ukrainian and Polish oil transportation systems is planned.
  • It will open the way for transportation of Caspian crude oil to consumers in Poland and Germany as well as through Gdansk oil terminal to the Baltic countries.


+++ Links