Mountain Valley Gas Pipeline (MVP)
Revision as of 13:21, 30 April 2024 by Abarrelfull (talk | contribs)
Summary Information
- Source:
- Destination:
- Ownership: Equitrans
- Website: https://www.equitransmidstream.com/
- Length: kilometres (303 miles)
- Capacity: per day
- Status: Under Construction
Details
- The Mountain Valley Pipeline (MVP) project is designed to transport natural gas from the prolific Marcellus and Utica shale regions to the growing demand markets of the mid-Atlantic and southeastern regions of the United States
- The pipeline is 42-inch in diameter and will traverse roughly 303 miles, extending from Equitrans’ existing transmission and storage system in Wetzel County, West Virginia to Transco Station 165 in Pittsylvania County, Virginia
History
- -
Other Information
- -