MIDAL Gas Pipeline

From A Barrel Full
Revision as of 08:24, 9 May 2024 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: Bunde * Destination: Ludwigshafen * Ownership: Gascade * Website: https://www.gascade.de/ * Length: 679 kilometres ( miles) * Capacit...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source: Bunde
  • Destination: Ludwigshafen
  • Ownership: Gascade
  • Website: https://www.gascade.de/
  • Length: 679 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

Details

  • With a length of 679 km on the north-south axis, the MIDAL (Mitte-Deutschland-Anbindungsleitung, Central Germany gas link) is the central element of Germany's gas pipeline system.
    • The northern section has a diameter of 900 mm and runs from Bunde and Rysum to Rehden.
    • The middle section connects Rehden with Reckrod, has a diameter of 1000 mm.
    • From Reckrod, with a nominal diameter of 800 mm, it continues for 210 kilometers to Ludwigshafen.
  • MIDAL-ERM is 57 km long, has a iameter of 400 mm and connects Jockgrim with Ludwigshafen.
  • MIDAL connects with STEGAL, WEDAL and RHG pipelines

History

  • 1964 - MIDAL-ERM was put into operation

Other Information

  • -

Links

  1. Gascade, MIDAL