Difference between revisions of "Fuka St Fergus Gas Processing Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
Line 24: Line 24:
 
* 1977 - Phase I of the plant was commissioned
 
* 1977 - Phase I of the plant was commissioned
 
* 1978 - Phase II was completed
 
* 1978 - Phase II was completed
 +
* 2015 - NSMP acquired the terminal from Total
  
 
+++ Links
 
+++ Links
 
# [http://www.total-icop.co.uk/fuka/ Total, FUKA]
 
# [http://www.total-icop.co.uk/fuka/ Total, FUKA]
 +
# [https://abarrelfull.blogspot.com/2024/05/nsmp-acquires-major-pipeline-and.html NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited]

Latest revision as of 10:05, 8 May 2024

Summary Information

+++ Brief Description

++++ Related Oil and Gas Fields

+++ Ongoing Projects

  • -

+++ Other Information

  • -

+++ History

  • 1977 - Phase I of the plant was commissioned
  • 1978 - Phase II was completed
  • 2015 - NSMP acquired the terminal from Total

+++ Links

  1. Total, FUKA
  2. NSMP Acquires Major Pipeline and Terminal System from Total E&P UK Limited