Difference between revisions of "Britannia Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: * Destination: SAGE St Fergus Gas Processing Terminal * Ownership: Harbour Energy * Website: * Length: kilometres ( miles) * Capaci...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Source:  
+
* Source: Britannia Gas Field
 
* Destination: SAGE St Fergus Gas Processing Terminal
 
* Destination: SAGE St Fergus Gas Processing Terminal
 
* Ownership: Harbour Energy
 
* Ownership: Harbour Energy
Line 10: Line 10:
  
 
=== Details ===
 
=== Details ===
* [[SAGE St Fergus Gas Processing Terminal]]
+
* The pipeline transports gas from the [[Britannia Gas Field]] to the [[SAGE St Fergus Gas Processing Terminal]]
  
 
=== History ===
 
=== History ===
* -  
+
* 1998 - Pipeline operations began
  
 
=== Other Information ===
 
=== Other Information ===
Line 23: Line 23:
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:UK]]
 
[[category:UK]]
[[category:Harbour]]
+
[[category:Harbour Energy]]

Latest revision as of 08:07, 9 May 2024

Summary Information

  • Source: Britannia Gas Field
  • Destination: SAGE St Fergus Gas Processing Terminal
  • Ownership: Harbour Energy
  • Website:
  • Length: kilometres ( miles)
  • Capacity: per day
  • Status: Operating

Details

History

  • 1998 - Pipeline operations began

Other Information

  • -

Links

  1. []