Difference between revisions of "Rio Bravo Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 22: | Line 22: | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
− | [[category: | + | [[category:USA]] |
− | [[category: | + | [[category:WhiteWater]] |
Revision as of 11:37, 13 May 2024
Summary Information
- Source:
- Destination:
- Ownership:
- Website:
- Length: kilometres ( miles)
- Capacity: per day
- Status: (Operating/Planned/Under Construction)
Details
- The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande Export Terminal LNG Project in Brownsville, Texas
History
- 2024 - Enbridge became a partner in the pipeline
Other Information
- -